58.7 F
New York
Sunday, October 2, 2022

Date:

Share:

SolarCraft Completes Solar Power Installation for Kistler Vineyards – Sonoma County Winery Captures the Sun and Saves

Related Articles

Three Northeast Schools win Explore.Act.Tell. Grant from ACME and Shaw’s/Star Markets’ Nourishing Neighbors

Ashburn, VA, September 27, 2022 --(PR.com)-- The Foundation for Impact on Literacy and Learning, in partnership with ACME Markets and Shaw’s/Star Markets’ Nourishing Neighbors Program,...
Novato, CA, August 11, 2022 –(PR.com)– The solar power installation consists of two separate systems. The larger of the two is 194.92 kW and roof mounted on the Kistler’s main building, which will power the winery’s office and business operations. With 443 high-efficiency solar panels, the system is expected to provide over 246,000 kWh of clean, green energy every year and any excess power generated flows back into the local utility system reducing the strain on the local power grid.

A second solar system, at 52.8 kW, powers the tasting room and one of the Ag pumps and is ground mounted on a hillside below the tasting room patio. Consisting of 120 solar panels it will provide almost 81,000 kWh of renewable solar energy annually. With a 25-year performance warranty and 40+ year design life on the major system components, this system will be saving Kistler thousands for decades to come.

The annual clean energy production of…

Read more…

Popular Articles